  • 浅谈超长地铁车站明挖法施工组织筹划

    Author(s):

    王玉剑

    Publication Title:

    Urban and Rural Studies 2020 No.08

    Affiliations:

    中铁十六局集团第一工程有限公司

    Abstract:

    文章以地铁施工为基础,根据目前我国地铁发展的现状,针对不断涌出的超长地铁车站的施工方法及施工工艺进行了总结.并对施工过程中可能遇到的施工难点及施工风险进行了分析.

    Keywords:

    地铁;车站;明挖